Earn Rewards on Every Order - Unlock Your Discounts Now!

Free UK Mainland Delivery On This Product | Lead Times Vary

Over 17,000+ Happy Customers

GRAF One2Clean Sewage Treatment Plant 15PE | G50204

£4,000.00
£4,800.00 (inc VAT)
£4,000.00 (exc VAT)

FREE UK 
DELIVERY

CUSTOMER OFFLOADING

BELOW
GROUND

SEWAGE
WATER

Quantity

Secure Payment - Multiple Payment Gateways

At a Glance

Key Specifications
15 PE Population Equivalent
3520 x 2240 x 2575 mm Tank Dimensions

Product Description

This product is delivered directly from the supplier, lead times vary.

 

The GRAF One2Clean 15PE is an advanced domestic sewage treatment plant designed for properties with up to 15 people. Using innovative SBR (Sequencing Batch Reactor) lifting technology, the system delivers exceptional wastewater treatment performance, achieving up to 99% pollutant removal while maintaining low operating costs and minimal maintenance requirements.

Unlike conventional treatment plants that rely on multiple chambers, pumps, and electrical components within the wastewater, the One2Clean uses a unique single-tank, single-chamber design. This reduces mechanical wear, improves reliability, and simplifies installation and servicing. Fully compliant with EN 12566-3 and CE certified, it provides excellent effluent quality suitable for environmentally sensitive discharge areas. With ultra-low energy consumption, reduced sludge production, and plug-and-play installation, the GRAF One2Clean 15PE offers an efficient, long-term solution for off-mains sewage treatment.

Product Features:

  • Suitable for properties with up to 15 people (15PE)
  • Advanced SBR lifting technology with up to 99% pollutant removal
  • Single-tank, single-chamber design
  • No pumps, moving parts, or electrical components within the wastewater
  • Ultra-low energy consumption of just 46 kWh per person per year
  • Very low sewage sludge production
  • Quiet, efficient operation
  • Integrated self-cleaning sampling point
  • Plug-and-play installation with no on-site wiring required
  • Durable injection-moulded construction
  • Stable in groundwater up to the tank's midline
  • Compact control panel for indoor installation
  • Optional outdoor control kiosk available
  • CE certified and compliant with EN 12566-3
  • Suitable for nutrient neutrality-sensitive locations

 

Key Benefits:

  • Reduced servicing and maintenance costs
  • Lower energy consumption compared to traditional treatment systems
  • Reliable operation with fewer mechanical components
  • Excellent treated water quality
  • Simple installation process
  • Long service life and robust tank construction
  • Environmentally responsible wastewater treatment solution
  • Ideal for homes and small developments without mains drainage

 

Installation & Maintenance:

  • Designed for installation in dry ground conditions
  • Granular base and backfill installation
  • No specialist electrical wiring required on-site
  • Easily accessible controls and sampling point
  • User-friendly monitoring and operation
  • Minimal sludge removal requirements compared to conventional systems

 

Specification Value
Model G50204
Population Capacity Up to 15 People
Dimensions (L x W x H) 3520 x 2240 x 2575 mm
Volume 10,000L
Weight (Empty) 455 kg
Inlet & Outlet Invert 630–830 mm
BOD 7 mg/l
Suspended Solids 14 mg/l
Ammonium (NH4-N) 0.5 mg/l

 

Graf One2Clean 15PE Drawing

Graf One2Clean Installation Guide

Graf UK Brochure

Ebara Optima Pump Specification

Graf One2Clean PIA Certificate 

Graf One2Clean IPS Pumped Option Information

Graf One2Clean Log Book

 

SKU: TANONE2GRA005

Why Buy Your Tank from Direct Drainage?

Free Tank Delivery

Tanks ship direct from the manufacturer, with lead times varying by product.

Best Price Guarantee 

Found the same tank cheaper? Send us the quote and we’ll try to match it.

Authorised Supplier

Buy with confidence from a sewage and drainage specialist.

Expert Tank Support

Need help choosing the right tank? Call our team on 01388 537050.

You May Also Like

CUSTOMER REVIEWS

Rated 4.8/5 by Direct Drainage Customers

Based on over 600 verified reviews

VERIFIED REVIEW

Very helpful from the start to the finish

Items were despatched quickly and arrived the next day. Would recommend.

Title

North Hayne Farm Cottages | 26 June 2026

VERIFIED REVIEW

Cheapest price I could find for the pump

Cheapest price I could find for the pump and delivery the next day what more could you want.

Title

Sam Jukes | 5 November 2025

VERIFIED REVIEW

Great service!

I ordered a septic tank it was delivered within a week and the delivery driver left it in the exact right place and time. Would definitely use this company again, thanks so much.

Title

Eve Harland | December 2025

OFFICIAL SUPPLIERS OF:

FAQs

From choosing the right treatment plant to installation, maintenance and UK regulations, we've answered some of the most common questions to help you find the right solution for your property.

What is the difference between a septic tank and a sewage treatment plant?

A septic tank separates solids from wastewater before allowing the liquid to drain into a suitable drainage field. A sewage treatment plant goes a step further, using biological processes to treat wastewater to a higher standard before discharge. Sewage treatment plants are often the preferred choice where improved treatment performance is required.

What size sewage treatment plant do I need?

The correct size depends on the number of people your property is designed to accommodate, the expected wastewater flow and the type of property. Sewage treatment plants are commonly rated by Population Equivalent (PE). It's important to select a system with sufficient capacity to handle your property's requirements. Our team can help you choose a suitable system.

Do sewage treatment plants need electricity?

Most sewage treatment plants require electricity to operate components such as air blowers, pumps or control systems. However, power consumption varies depending on the manufacturer and model. Some systems use low-energy technology to help minimise running costs. Always check the individual product specifications before purchasing.

How often does a sewage treatment plant need emptying?

Sewage treatment plants require periodic desludging to remove accumulated solids. This is commonly carried out at least once a year, although the frequency depends on the system, usage and manufacturer's recommendations. Regular servicing and maintenance are also essential to maintain performance and help prevent costly breakdowns.

Do you supply replacement parts for sewage treatment plants?

Yes! At Direct Drainage, we supply a wide range of sewage treatment plant spare parts, including air blowers, diaphragms, filters and other essential components. Whether you're carrying out routine maintenance or replacing a faulty part, our team can help you identify a suitable replacement for your system.

Do you stock all tanks and sewage treatment systems?

We do not stock tanks and treatment systems as standard. These are supplied directly from the manufacturer. The lead times of these systems will vary. If you need an accurate delivery date, please contact us on 01388 537050.

Are your prices inclusive of VAT?

It is important to note that all prices listed on our website exclude VAT. VAT will be calculated at checkout.