Use code SEWAGE5 for 5% off spare parts orders over £250

Buy With Confidence

We are an authorised reseller for major manufacturers

Best Prices Promise

If you find the same product cheaper, we'll match it

Same Day Dispatch

On all parts orders placed before 4pm when items are in stock

Clearwater 1250L Twin Sewage Pumping Station (DPSA-J)

Email us now to get a quick quote

sales@direct-drainage.co.uk

Or call to action

01388 537 050

Secure Payment

Multiple payment gateways for fast secure checkout.

Best Price Guarantee

If you find the same product cheaper elsewhere, we'll match it.

Direct Drainage Reviews

The Clearwater 1250L Twin Sewage Pump Station is manufactured from super-tough, low-maintenance GRP, and engineered with the highest quality parts and fittings. It is also appropriate where 24 hour storage requirements need to be maintained, Ideal for homes.

Product Ref: J - Sewage - 230v, 5.4A FLC, 18.4A Start, 1.2kW - Twin

 Klargester Pump Station Brochure 

 Grundfus AP50B Pump Specifications

 Klargester GRP Twin Pump Station Drawing

Product Benefits 

  • High level alarm fitted as standard with Twin Pump option
  • Made with super-tough, low maintenance GRP for guaranteed durability.
  • Supplied with control panel with options for remote monitoring system.
  • Designed with easy access features for maintenance.
  • Choose from either 110mm or 160mm inlet connections.
  • Lockable covers for optimum security.
  • Quick connection outlet couplings.
  • Reliable performing stainless steel submersible Grundfos pumps


Key Factors to size your Pump Stations

To size your pump stations they key factors to take into consideration are below

  • Application: domestic, residential or commercial.
  • Material application: sewage, effluent or surface water.
  • Inlet depth (below ground level).
  • Pumping distance and lift.
  • Electrical supply.

If you require assistance with sizing your Pump station, please give our friendly team a ring on 01388 537050.

 

Delivery

Our shipping costs cover most of the UK - however, parts of England, Scottish Highlands and Islands including areas north of the Glasgow / Edinburgh border, Isle of Wight, Channel Islands, Isle of Man, Anglesey, Western Isles, Shetland Islands, Orkney Islands, Isles of Scilly, Northern Ireland and the Republic of Ireland may cost more.

Please call before ordering if the delivery postcode is listed below. There may be additional shipping costs. AB, BT, CA, CT, DD, DG, EH, FK,G, GY, IM, IV, JE, KA, KW, KY, LD, LL, ML, PA, PH, PO 30-41 (Isle of Wight), SA, SY, TD, TN, TR, ZE Southern Ireland

Our lead times should only be used as a guide and are subject to change.

 

Offloading

Unless a hi-ab delivery has been booked at additional cost, it is the customer's responsibility to offload with suitable equipment on the day of delivery and a failed delivery may result in additional charges.

We recommend installers and/or plant hire & materials for install such as excavators, aggregates etc are not booked until you are in receipt of the goods. Direct Drainage cannot be held responsible for costs incurred due to unforeseen delays, please see our terms for more details.

If you have any questions regarding your delivery please contact us on 01388 537 050.

 

Service and Maintenance

Your pump station should be serviced bi-annually to prevent blockages or obstructions in the inlet or outlet pipes from occurring. Any service and maintenance works need to be carried out by a properly trained professional, with appropriate experience, especially with mechanical and electrical parts. Direct drainage is the trading arm of the UK's leading waste water maintenance company, RA Dalton. We can provide service and maintenance plans which meet the manufacturers requirements, which have been developed to help prevent catastrophic failures caused by blockages and unforeseen flow periods. Visit RA Dalton or contact the Direct Drainage Team on 01388537050 or for more information on the packages available.

 

Standard Commissioning

A Standard Commissioning carried by an RA Dalton Ltd accredited Engineer will include the following:

  • Carry out visual checks of the installation
  • Check the installation meets the manufacturer’s requirements, installed within their guidelines
  • Check all mechanical components
  • Check blower pressure, air hose, (aeration only)
  • Check clean air intake to blower housing/kiosk (aeration only)
  • IPS Models – check and test integrated pump
  • Test and set any alarms supplied with the unit (PPFDS, high Level Float)
  • Make any minor adjustments
  • Make any final connections
  • Provide a commissioning certification

 

On completion, RA Dalton will provide a site specific commissioning certificate

 

PLEASE NOTE: WE WILL ASK THAT A PRE COMMISSIONING CHECKLIST IS COMPLETED PRIOR TO ARRANGING ATTENDANCE TO ENSURE THE LEVEL OF COMMISSIONING REQUIRED IS STANDARD

You may also like

Fast Delivery To Your Door

We process orders the same day so you can trust us to get your order to you without delay.